Keston Frame & Header Kits Instalační manuál Strana 1

Procházejte online nebo si stáhněte Instalační manuál pro ne Keston Frame & Header Kits. Keston Frame & Header Kits Installation Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 20
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
FRAME & HEADER KIT
INSTRUCTIONS
Keston Heat 45
Keston Heat 55
Keston Heating
PO Box 103, National Avenue, Kingston Upon Hull, HU5 4JN
Tel. +44 (0) 1482 443005 Fax. +44 (0) 1482 467133
email : [email protected] web : www.keston.co.uk
Zobrazit stránku 0
1 2 3 4 5 6 ... 19 20

Shrnutí obsahu

Strany 1 - INSTRUCTIONS

FRAME & HEADER KITINSTRUCTIONSKeston Heat 45Keston Heat 55Keston HeatingPO Box 103, National Avenue, Kingston Upon Hull, HU5 4JNTel. +44 (0) 1482

Strany 2 - CONTENTS

10Keston Heat - Frame & Header Kits4.2.3 INSTALLATION DRAWING WITH 4 - 45 or 55 BOILERS (SIDE BY SIDE)Side by side wall or frame mounting dimensi

Strany 3 - 1 INTRODUCTION

11Keston Heat - Frame & Header Kits 4.2.4 INSTALLATION DRAWING WITH 5 - 45 or 55 BOILERS (SIDE BY SIDE)Side by side wall or frame mounting dimen

Strany 4

12Keston Heat - Frame & Header Kits4.2.5 INSTALLATION DRAWING WITH 6 - 45 or 55 BOILERS (SIDE BY SIDE)Side by side wall or frame mounting dimensi

Strany 5

13Keston Heat - Frame & Header Kits5 WALL MOUNTED INSTALLATION PROCEDURE5.1 WALL MOUNTED SIDE BY SIDE OPTIONEnsure wall is capable of supporting

Strany 6

14Keston Heat - Frame & Header Kits5.1 WALL MOUNTED SIDE BY SIDE OPTION CONT'D...PLAN VIEWSIDE VIEWCareful consideration MUST be gi

Strany 7 - IMPORTANT POINTS

15Keston Heat - Frame & Header Kits6 FRAME KIT INSTALLATION PROCEDURE6.1 SIDE BY SIDE FRAME KIT MOUNTING PROCEDURE1. Place the frame kit sectio

Strany 8 -

16Keston Heat - Frame & Header Kits6.2 BOILER MOUNTING7 HEADER KIT ASSEMBLY7.1 FITTING MIXING HEADER AND BLANKING FLANGES1. Fit the mixing head

Strany 9

17Keston Heat - Frame & Header Kits7.2 FITTING HEADER KIT ASSEMBLY2. Screw the header legs to the frame feet with the bolts, nuts & washers

Strany 10 - Side by side wall or

18Keston Heat - Frame & Header Kits1227.3 FITTING GAS CONNECTION1. Fit the gas isolation valve assembly supplied with the boiler to the boiler g

Strany 11

19Keston Heat - Frame & Header Kits8 ELECTRICAL CONNECTIONS9 COMMISSIONING AND TESTINGRefer to the Installer Wiring Connection section in the bo

Strany 12

2Keston Heat - Frame & Header KitsCONTENTS1 Introduction and General Description ...32 General Description of Cascade Syste

Strany 13

June 2013 UIN 209785 A01Keston pursues a policy of continuing improvement in the design and performance of its products. The right is therefore

Strany 14 - PLAN VIEWSIDE VIEW

3Keston Heat - Frame & Header Kits1 INTRODUCTIONThis technical data contains information for dimensioning & assembly of a cascade system kit f

Strany 15

4Keston Heat - Frame & Header Kits Total Output Required KwSide By Side Option – Number Of Boilers/Output RequiredSide by Side Footprint SizeW x D

Strany 16 - 7 HEADER KIT ASSEMBLY

5Keston Heat - Frame & Header Kits2.2 MULTIPLE BOILER INSTALLATIONS For installing 2 to 6 boilers, the product range includes water and gas heade

Strany 17

6Keston Heat - Frame & Header Kits3.3 GAS HEADERThe Gas header consists of a custom manufactured 2” manifold. This is located in a cradle incorp

Strany 18

7Keston Heat - Frame & Header KitsIMPORTANT POINTSBefore commencing installation:If Wall mounting; • Ensure wall is capable of supporting the wei

Strany 19 - 9 COMMISSIONING AND TESTING

8Keston Heat - Frame & Header Kits4 INSTALLATION DRAWINGS FOR MULTIPLE BOILER SYSTEMS4.1 GENERALThe multiple boiler systems are available in two

Strany 20

9Keston Heat - Frame & Header Kits 4.2.2 INSTALLATION DRAWING WITH 3 - 45 or 55 BOILERS (SIDE BY SIDE)Side by side wall or frame mounting dimens

Komentáře k této Příručce

Žádné komentáře